Model: QL10
The frontal load: 10 t
Minimum height :280mm
Maximum height :430mm
Packing size: 630×390×250mm
Net weight: 10.3 kg
Gross weight: 11.8 kg
Packing quantity of wooden case :4 sets/case
QL10T jack is a light and small lifting equipment that uses a rigid jacking piece as a working device to push heavy objects through the small stroke of the top bracket or the bottom claw.
Working principle: screw jack belongs to the mechanical principle, in the past to pull the handle, pull the claw is to promote the ratchet clearance rotation, small bevel gear drives the big bevel gear, so that the lifting screw rotation, lifting sleeve to get up or down, so as to achieve the function of lifting tension. Screw jack is easy to operate, safe and reliable.
Key points and main matters of using Jack of Crown Airlines
1) Jack placement. The foundation of the jack should be smooth, solid and reliable. When setting the jack on the bottom, it should be padded with wood or other appropriate materials to expand the force area.
2) Jack placement. When placing the jack on the soft ground, the wooden block should be placed under the jack, so as not to tilt after the force. When the weight is elevated, the support pad should be placed below the weight at any time, but the hand can not stray into the danger area.
In the placing process of the jack, keep the line of action of the load center of gravity consistent with the axis of the jack, and in the process of jacking, we should strictly prevent the danger of the jack slanting and tilting due to the slant of the jack foundation or the horizontal displacement of the load. To prevent the jacks and heavy metal surface or smooth concrete surface contact sliding, when necessary to cushion with hardwood blocks.
3) Jack jacking operation. Jack jacking height shall not exceed the effective jacking range. When lifting large objects (such as girder) should be separated at both ends of the rise and fall, one end of the rise and fall, the other end must pad, pad, put steady. Jacks are not allowed to be used over load.
Start the jack should not be rapid, the rhythm should rise at a uniform speed, to slow down. When multiple jacks are used at the same time, they should be operated synchronously. Jack operation is completed, to be carefully checked, check the oil pressure and hidden danger, and maintenance, placed in the appropriate place.